Project Information: The original Strauss Trunnion Bascule Bridge crossing the Inner Harbor-Navigation Canal at Florida Avenue provided a 91 ft. opening for marine traffic. Under the provisions of the "Truman-Hobbs Act" of 1940, funding was provided to replace the bridge with a new vertical lift bridge providing a 300-foot marine opening. The replacement bridge is at a low level grade carrying one railroad track and two-roadway lanes plus two sidewalks. The lift span is 352 feet long and has a maximum lift clearance of 156 feet. Modjeski and Masters, Inc. performed the following engineering services:
Phase I: Feasibility Study and Conceptual Estimate
Phase II: Refinement of the Feasibility Study
Phase III: Final Design, Contract Drawings and Specifications
Phase IV: Services During Construction |
|||
|
|
|||
|
|
|||