X
IH-70 Ramp A
Life-Cycle Engineering Services | EXPANDED

Modjeski and Masters is pleased to announce the acquisition of structural engineering firm Summit Engineering Group, Inc. Our combined engineering prowess and respective technical skillsets will enable us to provide streamlined design and construction solutions to best meet client needs.

Read More
Over the Top:  Gilmerton Bridge

One of five critical bridges in the Hampton Roads region of Virginia, the Henry G. Gilmerton Bridge is an essential hub for over one million vehicular and marine travelers each month. The 70-year-old bascule span was deteriorated behind rehabilitation, but because of the unusual geometry of the river and close proximity of a nearby railroad bridge, the Coast Guard mandated that the only option for replacement would be building the bridge on the same alignment, without impacting live traffic. The new vertical lift bridge – built using accelerated bridge construction methods – opened in November 2013 and reduces bridge openings by 40%.

Read More Play Video